Monitoring and Evaluation Database of Results Indicators in the Water Resources Area of Mozambique

01

M&A RH

Accessible and effective Database for Monitoring and Evaluation of Results Indicators in the Water Resources area of Mozambique

02

Indicators

Harmonized indicators for monitoring the commitments made in the PES, PQG, PNRH 2040, PA-ODS Water Resources 2015-2030

03

Data

Data domains and integrated information in BdD

04

Maps

Interactive maps of the Water Resources area

Planning Area Goals: Water Resources

Government Five-Year Program 2020-2024
Promover o desenvolvimento de infraestruturas ecnonómicas sociais e de administração
1. Dam Rehabilitation
0%
2. Construction of Dams
0%
3. Start Dam Construction
0%
4. Construction of P. Dams and R. Excavated
0%
1. Dam Rehabilitation

Rehabilitate dams of:

  • Chipembe (Balama/Cabo Delgado)
  • Macarretane (Chokue/Gaza)
  • Corumana (Moamba/Maputo)
2. Construction of Dams
Construction of dams:
  • Lócomuè (Lichinga/Niassa)
  • Gorongosa (Sofala Province)
3. Moamba Major Dam

Moamba Major Dam

  • Start construction of the Moamba Major dam (Moamba/Maputo)
4. Construction of S. Dams and Excavated R.
Build small dams and excavated reservoirs across the country
  • Niassa – 10
  • Cabo Delgado – 5
  • Nampula – 10
  • Zambezia – 10
  • Tete – 5
  • Manica – 5
  • Sofala – 5
  • Inhambane – 10
  • Gaza – 10
  • Maputo – 10

Reduzir vulnerabilidade das comunidades, da economia e infraestruturas aos riscos climáticos a calamidades naturais e antropogénicas

Protection Dikes
0%
Hydrological Forecast
0%
Hydrogeological Studies
0%
Strategic Plans
0%
Strategic Plans
0%
1. Protection Dikes

Rehabilitation of protective dikes in the river basins of:

  • Save (5Km)
  • Búzi (5Km)
  • Zambeze (10Km)
  • Limpopo/Xai-xai (10Km)
  • Messalo (3Km)
2. Hydrological Forecast
Establish complete hydrological forecast models for river basins in:
  • Megaruma
  • Messalo
  • Montepuez
  • Zambeze
3. Hydrogeological Studies

Carrying out hydrogeological studies:

  • Xai-Xai
  • Maxixe
  • Metuge
  • Nacala Porto
4. Strategic Plans

Preparation of strategic plans for the development and management of water resources in the river basins of:

  • Licungo
  • Messalo
  • Montepuez
  • Megaruma
5. Station Modernization
Construction/modernization of 50 water resources monitoring stations nationwide

Indicators

Data